by Brian Hioe
語言:
English
Photo Credit: lienyuan lee/WikiCommons/CC BY 3.0
THE EXECUTIVE YUAN has announced that it has approved plans for an extension of the high-speed rail between Yilan and Taipei. The high-speed rail would run from Nangang in Taipei through Xizhi, Pingxi, Shuangxi, and Gongliao in New Taipei before entering Toucheng and Jiaosi in Yilan and ending at a new station.
It is estimated that the new extension could serve up to 27,000 passengers on weekdays and 60,000 on weekends by 2051. It would cost 352.175 billion NT to build the extension and take 11 years to be completed in 2037, though it is likely that there would be delays in construction. Travel time between Taipei and Yilan would be reduced from 90 minutes to 28 minutes.
Nevertheless, the plans for an extension have not been without controversy. That is, the plan has been criticized as a potential waste of expenditure, as well as for the fact that the plan would occur through the high-speed rail, rather than upgrading the existing rail system.
For its part, the Ministry of Transportation and Communication (MOTC) claims that upgrading the existing rail system is not possible because of capacity limits, and because this would require crossing the Feitsui Reservoir Watershed. The MOTC also claims that a number of residential demolitions would have to take place if the extension were to take place, though extending the existing rail system would cost 220 billion NT.
It is debated whether extending the high-speed rail would lower traffic congestion, with the MOTC also claiming that the project is needed to reduce unmanageable levels of congestion on highways. It is believed that the high-speed rail system will only reduce traffic from Taipei to Yilan by 5%, but it will significantly decrease the profitability of the train between Taipei and Yilan.
As such, one notes that the high-speed rail extension has been criticized by the Taiwan Railways Union, the union that represents Taiwan Railways workers. The extension of the high-speed rail would lead to 58 billion NT in losses over the next 30 years, which is 800 million NT annually, for the Taiwan Railways. It may not be surprising, then, that Taiwan Railway workers have been among the critics of the plan.
Government officials, including former Minister without Portfolio Chang Ching-sen and former Minister of Transportation and Communications Ho Chen Tan, are among those to oppose the extension of the high-speed rail. This perhaps goes to show how the extension of the high-speed rail is debated.
To this extent, the government has been criticized for a lack of transparency. Only three public meetings were held about the plans to extend the high-speed rail, with relatively little public discussion ahead of the environmental impact assessment.
For its part, one notes that the government is moving toward plans to integrate all of Taiwan into four blocks, traversable by 90 minutes on high-speed rail. As such, plans are underway to upgrade the Taiwan Railway line connecting Hualien and Taitung, as well as Taitung and Pingtung. This would be with the aim of reducing travel across Taiwan as a whole, as well as strengthening regional integration. That being said, it is probable that there will also be concerns raised about such plans regarding the expense, the time required for this to take place, as well as the potential environmental impact, particularly on Taiwan’s eastern coast. That being said, developmentalist concerns are likely to prevail.
